Search Results

Search results for Environmental Design.

1506 items matching your search terms

  1. 07.-Evidence-of-Ms-Janelle-Tamihana-Nga-Hapu-o-Kereru.PDF [PDF, 263 KB]

    ...development of the Project from its inception. This has included participating in the shaping of the Ō2NL Project route selection and corridor refinement, communicating its values associated with Ō2NL environment and its position in terms of environmental effects of the Project, participating in the development of the Cultural and Environmental Design Framework (CEDF) and continuing to work in partnership with Waka Kotahi as the Project moves through the consenting process....

  2. 6.-Richard-Chilton-Air-Quality.pdf [pdf, 1.2 MB]

    ...emissions associated with earthworks and construction activities. 6. Technical Assessment E considers mitigation and management practices that I expect to control dust emissions so that offensive or objectionable dust effects beyond the proposed designation boundary do not occur. In this respect, Technical Assessment E was prepared on the basis that the notices of requirement ("NoRs") for the Project will be modified to provide for a more northerly alignment of the Proj...

  3. E25 Lighting JWS [pdf, 1 MB]

    ...need lighting enabled to the lighting pre-curfew limits for the same time duration. Hence, the pre-curfew lighting effects time limit should be adjusted to align with the time limits set for pre-curfew noise effects for events. 6. Event lighting design 6.1. Matters of agreement Consent condition 183K b) should be adjusted to read; “Setting design principles and establishing a monitoring regime for the event lighting installation to ensure compliance with the E24.6.1 General...

  4. [2022] NZEnvC 035 Mangawhai Matters Incorporated v Kaipara District Council [pdf, 1.7 MB]

    ...and 12). See also 16.3.9.1 5). 12 16.3.2.1 2) and 8); 16.3.4.1 8); 16.3.6.1 2) and 5); 16.3.11.1 4); and 16.6.3.1. 13 16.10.10.1. 14 16.8.2.2. 8 (g) Transport: Changes to transport provisions have been agreed (including relating to roading design, parking, manoeuvring, and cycling and pedestrian facilities and connectivity).15 (h) Fairy Tern / Tara Iti: A range of changes have been agreed to address potential effects on NZ Fairy Tern / Tara Iti, including:16 (i) changes to Po...

  5. Appendix-7_Julia-Williams_s87F-Report_Natural-Character_28-April-2023.pdf [pdf, 295 KB]

    ...character. (c) I support the package of natural character mitigation measures across the Ō2NL Project area that are illustrated in the Planting Concept Plan and supplemented by the long-term restoration concept set out in the Cultural and Environmental Design Framework (“CEDF”). (d) I agree that natural character in each catchment will be maintained once the proposed measures to rehabilitate and restore the natural characteristics and qualities have been fully implement...

  6. [2018] NZEnvC 210 Port of Tauranga Limited v Bay of Plenty Regional Council [pdf, 365 KB]

    ...requirements: 8 10.2.2 Sweeping operations must be undertaken by the operators to the standard specified below in order to control bark, dirt and other particulate matter in areas including the wharf apron, preload area, end of wharf and designated roadways (the area) and to prevent this material from entering into the harbour or entering the stormwater network. Bunk operations The area shall be cleaned by a suitable vacuum sweeper truck at intervals of no more than four h...

  7. Willowridge Developments Ltd - Alison Devlin - EIC - 25 February 2022 [pdf, 329 KB]

    ...25 February 2022 1 Introduction [1] My full name is Alison Devlin. I am the general manager – planning and development of Willowridge Developments Limited (Willowridge), a role I have been in since 2012. I have a BA(HONS) in Environmental Planning from the University of Strathclyde (Scotland) and an MSc in Environmental Management from the University of Paisley (Scotland). I am also a member of the Royal Town Planning Institute. Prior to taking up my current...

  8. [2017] NZEnvC 130 Butterbee Childcare Limited v Auckland Council [pdf, 972 KB]

    ...on the site for the duration of this consent. PRIOR TO THE OPENING OF THE CHILDCARE CENTRE Noise Management Plan 43. Prior to the operation of the childcare centre, the consent holder shall submit a Noise Management Plan (NMP) to the Manager Environmental Health, Northern Compliance, Auckland Council for approval. The NMP shall set out the operational measures to be implemented on the site to achieve the operational conditions of consent relating to hours of operation, numbers of...

  9. E60 Bob Hawkins - Nautical - EIC - Sealink [pdf, 711 KB]

    ...of my Report, which includes: (a) The Arboricultural Assessment prepared by Stuart Barton of Arbor Connect Limited, which is the principal application document of relevance to my evidence (the Arbor Connect Report)2; (b) The assessment of environmental effects report provided by Unio Environmental Limited3; (c) The landscape and visual effects assessment provided by John Goodwin of Boffa Miskell Limited4; (d) The urban design, landscape and planning figures provided by Bo...

  10. [2022] NZEnvC 101 Otago Regional Council - Urban Provisions [pdf, 1.9 MB]

    ...consideration of appropriate measures to reduce and/or attenuate stormwater being discharged from rain events. [28] In her evidence, Ms Boyd considers that the amended wording of this policy acknowledges the practical considerations required when designing stormwater systems while still ensuring that reducing or attenuating higher flows is a matter considered during design. [29] Finally, parties recognised that wastewater discharges to water are culturally offensive to Kāi Tahu...