D-G of Conservation - Murray Brass - EIC - 25 February 2022 [pdf, 234 KB]
...which exceed any of 3m depth, 250m3 volume or 1000m2 area, or involve explosives, other than earthworks for construction of a building which is covered by building consent. The matters of discretion include “the location, timing of construction, design and density of the earthworks”, “the control of run off”, “the effects on waterbodies” and “the effects on stormwater flows”. 40. The Waitaki District Plan does not contain specific rules relating to stormwater or ea...