Search Results

Search results for Environmental Design.

1684 items matching your search terms

  1. 2023-10-12-Proposed-Conditions-12-October-2023.pdf [pdf, 2.6 MB]

    ...and shown as purple underlined and purple strikethrough, with reference to the evidence seeking the amendment shown in [purple square brackets]. Ōtaki to north of Levin Highway Project DRAFT CONDITIONS: REBUTTAL VERSION (TRACKED) 2 Designations, resource consents and applicable conditions The following tables list the designations, resource consents, the conditions, lapse periods and expiry dates that apply to each resource consent. Designations Reference Designation A...

  2. [2024] NZEnvC 025 Shundi Queenstown Limited v Queenstown Lakes District Council [pdf, 2.6 MB]

    IN THE ENVIRONMENT COURT AT CHRISTCHURCH I TE KOTI TAIAO O AOTEAROA K IOTAUTAHI Decision No. [2024] NZEnvC 25 IN THE MA TIER of the Resource Management Act 1991 AND an appeal under s120 of the Act BETWEEN SHUNDI QUEENSTOWN LIMITED AND Court: Hearing: Appearances: Last case event: Date of Decision: Date of Issue: (ENV-2020-CHC-85) Appellant QUEENSTOWN LAKES DISTRICT COUNCIL Respondent Environment Judge J J M Hassan Environment Commissioner J T Baines 14 J

  3. [2022] NZEnvC 231 Hurupaki Holdings Limited v Whangarei District Council [pdf, 966 KB]

    ...prepared in accordance with Council’s Environmental Engineering Standards 2010 Edition. The engineering plans are to be submitted to the Council’s Development Engineer for approval. … Plans are to include but are not limited to: i. Design details of the construction of road to vest (Lot 100) in general accordance with: … • Road 1 long-section and layout 20183-00-RC-301 revision 2 dated July 2021, plus the construction of a new footpath to a minimum width of 1.8m w...

  4. 2023-08-101114-O2NL-JWS-Planning.pdf [pdf, 1.9 MB]

    ...Karaitiana (SK), Quentin Parr (QP) Issue Agreed Position Disagreements or reservations, with reasons 1. Status of the CEDF All agree that DTW5 requires the project to be consistent with chapter 3 of the CEDF (October 2022) with reference to the design responses in chapter 4 through the process of auditing also set out in chapter 4. The effect of this is to lock in the requirements for design principles in chapter 3 and lock in the audit process against chapter 4 of the CEDF, in th...

  5. 2021-08-02 ORC - MOC - in response to directions issued at PHC [pdf, 373 KB]

    ...controlled activity rule applies to the construction, use and maintenance of an animal effluent storage facility constructed after 25 March 2020. Some amendments to the conditions have been made, primarily to clarify technical aspects of their design and construction, and the rule now refers to a management plan prepared in accordance with Schedule 21. (e) Discretionary activity Rule 14.7.3.1: some minor amendments to this rule have been made to reflect that it is a “drop dow...

  6. 17.-Evidence-of-Mr-Nick-Keenan-Stormwater-Management-Design.PDF [PDF, 432 KB]

    ...requirement under sections 87G and 198E of the Act for the Ōtaki to North of Levin Project By Waka Kotahi NZ Transport Agency STATEMENT OF EVIDENCE OF NICHOLAS JOHN KEENAN ON BEHALF OF WAKA KOTAHI NZ TRANSPORT AGENCY STORMWATER MANAGEMENT DESIGN Dated: 4 July 2023 mailto:david.allen@buddlefindlay.com mailto:thaddeus.ryan@buddlefindlay.com TABLE OF CONTENTS INTRODUCTION .........................................................................................

  7. 29a.-Appendix-A-to-the-Evidence-of-Ms-McLeod-O2NL-Conditions-Evidence-Version-Tracked.pdf [pdf, 2.4 MB]

    ...Construction footprint The area in the Project Area within which construction activities occur. Contaminated land For the purpose of Condition RSW1, a piece of land described in subclause (7) or (8) of the Resource Management (National Environmental Standard for Assessing and Managing Contaminants in Soil to Protect Human Health) Regulations 2011 The term is added as a consequence of an amendment to Condition RSW1. Detailed site investigation Has the same meaning...

  8. Derek Onley (filed 6 June 2017) [pdf, 820 KB]

    ...Scottish Natural Heritage (SNH) 2005. Survey methods for use in assessing the impacts of onshore wind farms on bird communities. Scottish Natural Heritage (SNH) 2006. Assessing significance of impacts from onshore wind farms on birds outside designated areas. Scottish Natural Heritage (SNH) 2005. Wind farms and birds: Calculating a theoretical collision risk assuming no avoiding action. A guidance note. Southey 2009, Migration in New Zealand. Southern Bird...

  9. [2022] NZEnvC 221 New Zealand Transport Agency [pdf, 1.8 MB]

    ...the matters the Court raised , and with some of the issues raised by other parties. [3] The Court issued a minute on 21 October 2022 directing some final changes to conditions. Final conditions were lodged on 2 November 2022, and a final set of design drawings were also lodged on 2 November 2022. 1 [4] Subject to those conditions, the Notices of Requirement sought are granted, as are the Resource Consents. The final set of conditions is attached to this decision. [5] Costs (includ...

  10. Applicant's Revised Conditions 24 August 2018 [pdf, 1.4 MB]

    ........................................................................... 9 Pre-construction Conditions ............................................................................... 10 Community Liaison Group.............................................................................................. 10 Base Design - Buildings, Structures Signage/Branding and Yard Areas .................. 11 Public Space Design .............................................................................