2023-10-10-Rebuttal-Evidence-of-N-Keenan-Stormwater.pdf [pdf, 255 KB]
...Person (SQP) (a Chartered Engineer) independent of the design process in the form of a technical review. That engineer will sign off the plans. Waka Kotahi will have this verification prior to the construction phase to ensure the objectives of its Environmental Plan and Policy are met by the designs. P46 notes that: As-built certification forms as set out in the NZTA (2010), Stormwater Treatment Standard for State Highway Infrastructure, should be used or replaced with agreed alt...