U Ltd v UH [2025] NZDT 220 (3 June 2025) [pdf, 215 KB]
...To design the pool the way I have shown it will involve at least three weeks excluding the drawings that is why I wanted to make sure that this is really what you wanted”. After that email the architect, Mr G, made changes that he referred to in emails dated 9 and 12 May. He referred to updated drawings where he had “pushed the pool out to accommodate the cover pit’. Mr G sent U Ltd an ‘updated building information model’. NC summarised the main changes as being the addition o...