[2024] NZEnvC 091 Crafar v Taupo District Council [pdf, 355 KB]
...(Transpower), with Todd transferring their consent for grid operations and maintenance to Transpower in the future. The proposal for the substation and the transmission line connections are considered to be inseparable as the substation will transform power produced by the solar project ready for transmission to the national grid. [3] The Site and its surroundings lie within an area of modified frost flats at the southern end of the Kaingaroa Plains in the North Island Volcanic Plateau...