FN & NH v K Ltd & O Ltd [2023] NZDT 466 (25 August 2023) [pdf, 247 KB]
...that they could complete the subdivision without the need for a right of way by adjusting the boundary line between Lot 1 and Lot 2. This would remove the up-front cost of stormwater drainage, which mostly pertained to the right of way. 14. FN telephoned ZB. FN submitted that ZB initially told her that the boundary could not be changed without reducing one of the lots below the 4000m2 limit, but then conceded that it could be done, and he drew an amended scheme plan. 15. On the amen...