[2024] NZEnvC 201 Li v Auckland Council [pdf, 584 KB]
...note: Acceptable forms of evidence include CCTV inspection report of the drainage along with accurate as built plans of the private stormwater systems for Lot 1 & 2.3 The full CCTV inspection reporting (plan, logs and footage) provide the investigation methodology which will allow Council to verify the location of the private stormwater drainage to the approved soakage devices. Where the site investigation report demonstrates that the existing drainage arrangement is contrar...