Wilton TRI-2021-100-002 [2023] NZWHT AUCKLAND 01 [pdf, 629 KB]
...Mr Wilton himself, as a structural engineer and director of Wilton Joubert Ltd, the sixth respondent. The design work, plans and specifications were undertaken in 2009. The architect, as agent for the claimants, made application for building consent which was granted on 28 January 2010. The built date has been determined as 2 September 2011. [6] Cracking to the exterior plaster and paint finishes was first noted on the north exterior wall in 2012,1 and again in 2013 “small cr...