Final-Technical-Assessment-G-Hydrogeology-and-Groundwater-v2.pdf [pdf, 9.1 MB]
...undertaken, additional data collected, and the design of the Project refined. Figure G.13: Groundwater level monitoring bores used to inform the design of the Ō2NL Project. (Source: Horizons & GWRC databases, September 2021 and Project files). 92. Twelve pairs of nested monitoring bores were installed to compare the groundwater levels in both shallow and deep bores at a single location. Most bores were constructed of PN12, 32mm diameter uPVC with 0.5mm diameter slotted s...