Search Results

Search results for no licence.

7596 items matching your search terms

  1. KT v X Ltd [2024] NZDT 748 (15 November 2024) [pdf, 102 KB]

    CI0301_CIV_DCDT_Order Page 1 of 4 (Disputes Tribunal Act 1988) ORDER OF DISPUTES TRIBUNAL [2024] NZDT 748 APPLICANT KT RESPONDENT X Ltd The Tribunal orders: X Ltd is to pay KT $787.95 on or before Tuesday 10 December 2024. Reasons: 1. KT is the legal welfare guardian of her special needs daughter, KP. KT claims for repair costs for a [bidet] purchased for KP in 2021 from X Ltd, through Enable Ministry of Health funding. When the bidet

  2. MLC2019 September National Pānui [pdf, 344 KB]

    ...Ngatihine H2B - Noting: Variation of Nga Whenua Rahui 50 A20190005753 150A(4)/93 WRMK Lawyers Lot 10 DP 37339 being part Pukahakaha East 5B - Noting: Transfer of lease 51 A20190006263 150A/93 Eugene and Tania Reihana Motatau 2 Sec 21B2E - Noting: Licence to occupy TÄKITIMU At Hastings | Maori Land Court, 2nd Floor,Heretaunga House, Cnr Lyndon Rd & Warren St, Hastings Wednesday 4 September 2019 | Judge L R Harvey Presiding Applications for Hearing PÄNUI NO: TIME: APPLICATION NO...

  3. E30 First Planning JWS [pdf, 2.7 MB]

    ...for the Project or (as the case requires) commencement of any construction works for a part or stage of the Project. For the avoidance of doubt, it excludes site investigations, fencing, and any activities that do not need resource consent / are permitted activities. h) “consent holder” means Panuku Development Auckland; i) “Council” means the Auckland Council; j) “Harbourmaster” means the Harbourmaster’s office within Auckland Transport; k) "Project" mean...

  4. E27 Contamination, Groundwater, Earthworks and Air Discharges JWS [pdf, 3 MB]

    ...for the Project or (as the case requires) commencement of any construction works for a part or stage of the Project. For the avoidance of doubt, it excludes site investigations, fencing, and any activities that do not need resource consent / are permitted activities. h) “consent holder” means Panuku Development Auckland; i) “Council” means the Auckland Council; j) “Harbourmaster” means the Harbourmaster’s office within Auckland Transport; k) "Project" mean...

  5. E96 Phillip Ware - Contaminated Land & Groundwater - RE – Applicant [pdf, 9 MB]

    ...prescribed in the Auckland Unitary Plan (Operative in Part). 4.3 I have discussed this matter directly with Kurt Grant from the Wynyard Edge Alliance and he has confirmed that the Alliance is likely to source all of the imported fill material from a licenced quarry. This would achieve compliance with the matters sought by Ms Jukic. 4.4 Should material need to be sourced from off site and not from a licenced quarry I consider that the flexibility afforded by the revised wording, spe...

  6. [2019] NZEnvC 173 Summerset Villages (St Johns) Limited v Auckland Council [pdf, 9 MB]

    ...the buildings when viewed from the south. The reason for the limited viewpoint is that the buildings and trees interfere with views at the current time and clearly the construction of any buildings upon St Johns College in accordance with their permitted activity precinct status would compromise views from viewpoint 13. Issues around acceptability [16] There did not appear to be any substantive argument as to the appropriateness 5 of this Site for a retirement village. The iss...

  7. Rec-Recap-2024-Q1-FINAL.pdf [pdf, 873 KB]

    ...all settings, including trails on private land. b. That track grading standards are developed and (mandatorily) implemented by those in each setting where the public have access (including private landowners). c. That a corresponding system of licencing and compliance is developed. d. That similar consultation is conducted to lead to the development and implementation of a single national signage standard, which includes advice on key safety messages. In particular, standards should...

  8. [2020] NZEnvC 025 Willis Bond Capital Partners No. 3 Limited [pdf, 914 KB]

    ...identify the locations and extent of contamination in accordance with the draft Site Management Plan prepared by Tonkin and Taylor, Job Number 86190, dated January 2018. 29. Any excess soil material removed from the site shall be disposed of at a licenced facility authorised to accept such material. 30. A Site Validation Report (SVR) (in accordance with the Ministry for the Environment Contaminated Land Management Guideline (CLMG) 1) shall be prepared following the works and submitted...

  9. Management Committee of Mangatawa Papamoa Blocks Incorporation - Lot 1 DPS 65413 and Part Mangatawa Papamoa SO 452445 (2018) 156 Waikato Maniapoto MB 77 (156 WMN 77) [pdf, 732 KB]

    ...opportunity that a man in the street should not pass by. [42] The land is zoned Residential A. Absent any lengthy and expensive private plan change, which in all probability would need to be publicly notified, the proposal is in accordance with permitted planning rules. The proposal will also allow the freehold to be retained by Mangatawa whilst using a leasehold title for the development of a retirement village. That protection together with the projected financial returns persuad...

  10. [2018] NZEnvC 129 Royal Forest and Bird Protection Society v Canterbury Regional Council [pdf, 7 MB]

    ...measured on a kg/ha basis, but calculated on the gross load per property from the date this Plan is made operative. (b) r 10.2 specifies that a change of land use, so defined, in a 'Nutrient Management Area' shown on HWRRP Map 4, is a permitted activity, provided its specified conditions are met. Relevantly, that includes the following condition: (b) for changes in land use in the Hurunui catchment above SH1, the dissolved inorganic nitrogen and dissolved reactive phos...